Latest revision |
Your text |
Line 129: |
Line 129: |
| | | |
| * Attended the Silicon Mountain Conference today. | | * Attended the Silicon Mountain Conference today. |
− |
| |
− | = Week 5 =
| |
| | | |
| = Sunday June 21st = | | = Sunday June 21st = |
Line 158: |
Line 156: |
| * Upgraded to qmake-qt5, updated my LibreCAD repository and build it. | | * Upgraded to qmake-qt5, updated my LibreCAD repository and build it. |
| | | |
− | * Awaiting review from my mentor for the [https://paste.kde.org/pq37vefit improved] the code snippet. | + | * Awaiting review from my mentor for the [https://paste.kde.org/pq37vefit improved] the code snippet |
− | | |
− | = Thursday June 25th =
| |
− | | |
− | * Did not do any work today due to housekeeping.
| |
− | | |
− | = Friday June 26th =
| |
− | | |
− | * More critique on code from my mentor.
| |
− | | |
− | * Improved [https://paste.kde.org/pq4vt14lx code] based on corrections discussed on IRC.
| |
− | | |
− | * Chatted a little with brlcad on #brlcad and ries on #librecad today.
| |
− | | |
− | = Saturday June 27th =
| |
− | | |
− | * Today was a lazy day for me. Did not code.
| |
− | | |
− | = Mid-term Evaluation Week(Week 6 )=
| |
− | | |
− | =Monday June 29th=
| |
− | | |
− | * After a deeper look at my logic of getTangentPoint(), I overhauled my code to have [https://paste.kde.org/pkt2o2ifh this].
| |
− | | |
− | * My mentor has confirmed that my logic is a step int the right direction and has suggested that I use github and email more including IM/IRC.
| |
− | | |
− | * Starting to design unit tests for this getTangentPoint() function.
| |
− | | |
− | = Tuesday June 30th =
| |
− | | |
− | * Filled Student evaluation form today.
| |
− | | |
− | * Working on unit test for getTangentPoint() member function.
| |
− | | |
− | * Some work in progress available [https://paste.kde.org/pvnynjgvt here]
| |
− | | |
− | = Wednesday July 1st =
| |
− | | |
− | * Sick day:I have not been able to do any work because of the symptoms of malaria I've been experiencing since morning.
| |
− | | |
− | * I've developed the unit tests for the getTangentPoint() in librecad/src/main.cpp and LibreCAD builds well.
| |
− | | |
− | * Next step is running the code to see the results from the function.
| |
− | | |
− | = PRE MIDTERM EVALUATION SUMMARY=
| |
− | | |
− | I was rather off to a slow start for GSoC 2015 coding due to my final year management project. However, I've written the getTangentPoint() member function for the LC_Hyperbola and I am currently designing appropriate test cases to ascertain the effectiveness of getTangentPoint() function. When I've perfected these test cases, anyone will be able to run these tests after compiling LibreCAD by ./lc on the command line in the unix/ directory.
| |
− | | |
− | = Thursday July 2nd =
| |
− | | |
− | * Sick day: Have not done any work today. Currently on medications.
| |
− | | |
− | * Managed to post my pre midterm evaluation summary to my development logs, BRL-CAD mailing list and cc'ing my mentors in LibreCAD and BRL-CAD.
| |
− | | |
− | * Updated my LibreCAD [https://github.com/Ngassa/LibreCAD repositories] too.
| |
− | | |
− | = Friday July 3rd =
| |
− | | |
− | * Sick day: Haven't been able to do any work due to illness.
| |