Difference between revisions of "User:Izak/GSOC 2013 logs"

From BRL-CAD
(From June 3rd to June 7th)
(From June 3rd to June 7th)
Line 15: Line 15:
 
==From June 3rd to June 7th==
 
==From June 3rd to June 7th==
  
*Compiled BRL-CAD from source (in 26 minutes).
+
*Compiled and ran  BRL-CAD from source (in 26 minutes) as well as used mged command interface.
  
 
* Studying /src/librt/primitives/*/*.
 
* Studying /src/librt/primitives/*/*.

Revision as of 16:44, 13 June 2013

PROJECT DETAILS

Project Title : Implementation of a heart primitive.

Name: Isaac Kamga.

IRC Name (Handle): Izak

e-mail: u2isaac@gmail.com

Phone : +237 74 10 62 97

Introduction

This page will contain logs of the work I will be doing during and after the summer of code period.

From June 3rd to June 7th

  • Compiled and ran BRL-CAD from source (in 26 minutes) as well as used mged command interface.
  • Studying /src/librt/primitives/*/*.
  • Revising red-black trees in "Introduction to algorithms",third edition book by Cormen.

From June 10th to June 14th

  • Fixing rb_delete.c to effectively delete nodes.

From June 17th to June 21

From June 24th to June 28th