Difference between revisions of "User:Stattrav/GSoC2012"

From BRL-CAD
(Pointer changed in the roadmap)
m (Pointing to the things I am working on as per the roadmap.)
Line 17: Line 17:
 
| (May 1 - May 8)
 
| (May 1 - May 8)
 
|  
 
|  
|- style="color:green;"
+
|-  
 
| Design discussion: Choice of tools, data to be captured, authentication if required, database design and design documentation.
 
| Design discussion: Choice of tools, data to be captured, authentication if required, database design and design documentation.
 
| (May 8 - May 19)
 
| (May 8 - May 19)
| In progress
+
|  
|-
+
|- style="color:green;"
 
| Db design, log parser and documentation
 
| Db design, log parser and documentation
 
| (May 19 - May 26)
 
| (May 19 - May 26)
|  
+
| In progress
 
|-
 
|-
 
| Design discussion: API design, sync mechanism design and documentation  
 
| Design discussion: API design, sync mechanism design and documentation  

Revision as of 15:45, 21 May 2012

Benchmark Performance Database

Abstract

This project aims to provide more channels to the users to submit the benchmark logs of their brlcad installations ( via the web API, ftp, scp in addition to the existing channel of email), implement an efficient storage and retrieval of logs (via the database and the archiving of the files) and provide an interface to access the logs via graphical means or otherwise.

Detailed proposal

Development Logs

Logs

Roadmap

Issue Timeframe Status
Familiarizing self with the benchmark toolkit and the structure. (May 1 - May 8)
Design discussion: Choice of tools, data to be captured, authentication if required, database design and design documentation. (May 8 - May 19)
Db design, log parser and documentation (May 19 - May 26) In progress
Design discussion: API design, sync mechanism design and documentation (May 27 - June 2)
Web API (June 2 - June 9)
FTP/SCP and IMAP to Queue folder sync (June 9 - June 20)
Design discussion: scripts. (June 20 - June 24)
Scripts (June 25 - June 30)
Design discussion: Frontend and documentation (July 1 - July 6)
Frontend (July 7 - July 20) {Mid-term evaluations}
Design discussion: User end tools and documentation (July 20 - July 27)
User end tools implementation (July 27 - Aug 5)
Integration of the tools developed so far (Aug 5 - Aug 10)
Fixing bugs and consolidating the individual documentation and buffer time (Aug 10 - )

Milestones

Milestone Date Status
Web API and db schema and a log parser June 9
Functional system for data collection - data collection, data extraction and storage June 30
Frontend July 20
User end tools Aug 5
Integration of every thing. Aug 10