Difference between revisions of "Ali Haydar Dev log 2024"
From BRL-CAD
Ali Haydar (talk | contribs) (→Coding period) |
Ali Haydar (talk | contribs) (→Coding period) |
||
Line 3: | Line 3: | ||
=Coding period = | =Coding period = | ||
− | * May 27 setting up the enviroment, the configureation is failing on both windows and ubuntu will have to ask the mentors for help | + | * May 27 setting up the enviroment, the configureation is failing on both windows and ubuntu will have to ask the mentors for help. The issue seems to be related to BRL-CAD/bext, I will follow the procedure described in https://brlcad.zulipchat.com/#narrow/stream/104062-brlcad/topic/build |
Revision as of 15:39, 27 May 2024
Development log k-g converter 2024
This page will contain a day to day development record of the k-g converter, Google summer of code 2024
Coding period
- May 27 setting up the enviroment, the configureation is failing on both windows and ubuntu will have to ask the mentors for help. The issue seems to be related to BRL-CAD/bext, I will follow the procedure described in https://brlcad.zulipchat.com/#narrow/stream/104062-brlcad/topic/build