Difference between revisions of "SJ"

(Added the milestones to the page)
Line 92: Line 92:
 
|
 
|
 
|}
 
|}
 +
 +
==Logs==
 +
[[User:Stattrav/GSoC2012_log| Logs]]

Revision as of 13:59, 1 May 2012

Link to proposal Stattrav proposal 2012

Roadmap

Issue Timeframe Status
Familiarizing self with the benchmark toolkit and the structure. (May 1 - May 8)
Design discussion: Choice of tools, data to be captured, authentication if required, database design and design documentation. (May 8 - May 19)
Db design, log parser and documentation (May 19 - May 26)
Design discussion: API design, sync mechanism design and documentation (May 27 - June 2)
Web API (June 2 - June 9)
FTP/SCP and IMAP to Queue folder sync (June 9 - June 20)
Design discussion: scripts. (June 20 - June 24)
Scripts (June 25 - June 30)
Design discussion: Frontend and documentation (July 1 - July 6)
Frontend (July 7 - July 20) {Mid-term evaluations}
Design discussion: User end tools and documentation (July 20 - July 27)
User end tools implementation (July 27 - Aug 5)
Integration of the tools developed so far (Aug 5 - Aug 10)
Fixing bugs and consolidating the individual documentation and buffer time (Aug 10 - )


Milestones

Milestone Date Status
Web API and db schema and a log parser June 9
Functional system for data collection - data collection, data extraction and storage June 30
Frontend July 20
User end tools Aug 5
Integration of every thing. Aug 10

Logs

Logs