Difference between revisions of "SJ"

(User:Stattrav moved to Stattrav proposal 2012: That particular space of User:Stattrav shall be used for the project log and documentation related to that.)
 
(Roadmap of the project has been added.)
Line 1: Line 1:
 
#REDIRECT [[Stattrav proposal 2012]]
 
#REDIRECT [[Stattrav proposal 2012]]
 +
 +
==Roadmap==
 +
{|style="color:black;background-color:#ffffcc;" cellpadding="20" cellspacing="0" border="1"
 +
!Issue
 +
!Timeframe
 +
!Status
 +
|-
 +
| Familiarizing self with the benchmark toolkit and the structure.
 +
| (May 1 - May 8)
 +
|
 +
|-
 +
| Design discussion: Choice of tools, data to be captured, authentication if required, database design and design documentation.
 +
| (May 8 - May 19)
 +
|
 +
|-
 +
| Db design, log parser and documentation
 +
| (May 19 - May 26)
 +
|
 +
|-
 +
| Design discussion: API design, sync mechanism design and documentation
 +
| (May 27 - June 2)
 +
|
 +
|-
 +
| Web API
 +
| (June 2 - June 9)
 +
|
 +
|-
 +
| FTP/SCP and IMAP to Queue folder sync
 +
| (June 9 - June 20)
 +
|
 +
|-
 +
| Design discussion: scripts.
 +
| (June 20 - June 24)
 +
|
 +
|-
 +
| Scripts
 +
| (June 25 - June 30)
 +
|
 +
|-
 +
| Design discussion: Frontend and documentation
 +
| (July 1 - July 6)
 +
|
 +
|-
 +
| Frontend
 +
| (July 7 - July 20) {Mid-term evaluations}
 +
|
 +
|-
 +
| Design discussion: User end tools and documentation
 +
| (July 20 - July 27)
 +
|
 +
|-
 +
| User end tools implementation
 +
| (July 27 - Aug 5)
 +
|
 +
|-
 +
| Integration of the tools developed so far
 +
| (Aug 5 - Aug 10)
 +
|
 +
|-
 +
| Fixing bugs and consolidating the individual documentation and buffer time
 +
| (Aug 10 - )
 +
|
 +
|-
 +
|}

Revision as of 07:20, 1 May 2012